Planning Motivation Control

The complexity of the automation system. Classification and levels of automated systems. Functional software setting

Inactive

FERp 81-05-Pr-2001

STATE ESTIMATE STANDARDS

FEDERAL SINGLE PRICES FOR COMMISSIONING WORKS
FERp-2001

IV. Applications

State estimated standards. Federal unit prices for commissioning works (hereinafter - FERp) are intended to determine the costs when performing commissioning works and to draw up estimates (estimates) on their basis for the production of these works.

Approved and entered into the federal register of estimated standards to be applied in determining the estimated cost of objects capital construction, the construction of which is financed with the involvement of federal budget funds by the Order of the Ministry of Construction and Housing and Communal Services of the Russian Federation of January 30, 2014 N 31 / pr (as amended by the Order of the Ministry of Construction of Russia of 02/07/2014 N 39 / pr).

Electrical devices

Electrical devices

Appendix 1.1. Commissioning structure


Appendix 1.1

Stages of work

Share,%, in total costs (rate)

Preparatory work

Adjustment work carried out before individual testing of technological equipment

Adjustment work during the period of individual testing of technological equipment

Complex testing

Registration of working and acceptance documentation

Appendix 1.2. Terms and definitions used in FERp Part 1

Appendix 1.2

Term

Definition

Switching device

An electrical device that switches off the load current or removes the voltage of the supply network (circuit breaker, load switch, separator, disconnector, switch, packet switch, fuse, etc.).

Local government

Control, in which controls and switching devices are structurally located on the same panel or panel.

Remote control

Control, in which controls and switching devices are structurally located on various panels or boards.

Connecting secondary switching

Secondary circuit of control, signaling, voltage transformers, etc., limited to one group of fuses or a circuit breaker, as well as a secondary circuit of current transformers of the same purpose (protection, measurement).

Connection of primary switching

An electrical circuit (equipment and buses) of the same purpose, name and voltage, connected to the buses of a switchgear, generator, switchboard, assembly and located within a power station, substation, etc.

Electric circuits of different voltages (regardless of the number) of one power transformer.

All switching devices and busbars through which a line or transformer is connected to a switchgear.

Section of a two-, three- or four-wire electrical network

Device

A set of elements in a product made in a single structure (for example: a cabinet or control panel, a relay protection panel, a cell, a power supply, etc.).

The device may not have a specific functional purpose in the product.

Signaling section

Signal realization device.

Any element of the electrical circuit (potentiometer, resistor, capacitor, etc.), the parameter value of which requires regulation according to the manufacturer's instructions.

Functional group

The set of elements performing in the system automatic control or regulation of a specific function and not combined into a single structure (for example: a relay-contactor circuit for controlling an electric drive, a reference unit, a regulator unit, a dynamic compensation unit, a linearization unit, a unit for forming a parameter of a certain functional dependence, etc.).

The control apparatus as part of the relay
contactor functional group

A relay element that performs the function of setting a coordinate or changing it according to a given control law (for example: button, control key, limit and limit switches, contactor, magnetic starter, relay, etc.).

Automatic control system

An automatic control system in which the goal of control in static and dynamic modes is achieved by optimizing closed control loops.

Automatic control system

A set of functional groups that provide automatic change of one or more coordinates of the technological object of control in order to achieve the set values ​​of the controlled quantities or to optimize a certain criterion for the quality of regulation.

Element of an automatic control or regulation system

An integral part of the circuit, which has a single design, a detachable connection, performs one or several specific functions in the product (amplification, conversion, generation, signal shaping) and requires testing at the stand or in a specially assembled circuit for compliance with the specifications or requirements of the manufacturer.

Technological object

A set of technological and electrical equipment and implemented on it technological process production.

Technological complex

A set of functionally interconnected means of technological equipment (units, mechanisms and other equipment) for performing specified technological processes and operations in production conditions in order to implement all stages of obtaining the quantity and quality of the final product established by the project.

Mechanism

A set of movably connected parts that perform predetermined movements under the action of applied forces.

A set of two or more mechanisms working in combination and providing a given technological production process.

Dispatch control area

A set of mechanisms or electrical devices connected by a single technological cycle and a common control scheme.

Trial

Application of current or voltage to the object during the test, regulated by the normative document.

Test object

An independent live part of a cable, busbar, apparatus, transformer, generator, electric motor and other devices.

Cable penetration

A conductive device designed to transmit electrical energy by means of special power and control cables through hermetically sealed rooms or tight boxes of nuclear power plants.

Automated control systems

Appendix 2.1. Categories of technical complexity of systems, their characteristics and coefficients (part 2 section 1)

Appendix 2.1

System characteristics (structure and composition of KTS or KTS)

Coefficient
system complexity

Single-level information, control, information and control systems, characterized in that measuring and control devices, electromagnetic, semiconductor and other components, signal fittings, etc. are used as components of the CTS to perform the functions of collecting, processing, displaying and storing information and generating control commands .NS. instrumental or hardware types of execution.

Single-level information, control, information and control systems, characterized in that programmable logic controllers (PLC), intra-system communication devices, microprocessor operator interfaces (panels display).

Single-level systems with automatic mode indirect or direct (direct) digital (digital-to-analog) control using object-oriented controllers with programming of settings parameters, for the functioning of which the development of project hardware and software is not required.

Information, control, information and control systems, in which the composition and structure of the CTS meet the requirements established for classifying systems to the I category of complexity and in which fiber-optic information transmission systems (FOTS) are used as communication channels.

Measurement and (or) automatic control systems chemical composition and the physical properties of the substance.

Measuring systems (measuring channels) for which metrological certification (calibration) is required according to the project.

Multilevel distributed information, control, information and control systems, in which the composition and structure of the local-level CPTS meet the requirements established for classifying the system as the II category of complexity and in which process (PCS) or operator (OS) are used to organize subsequent control levels stations, implemented on the basis of problem-oriented software, connected with each other and with the local control level by means of local computer networks.

Information, control, information and control systems, in which the composition and structure of the CTS (CTS) meets the requirements established for classifying systems to the II category of complexity and in which fiber-optic information transmission systems (FOTS) are used as communication channels.

Notes:

1. Systems of II and III categories of technical complexity may have one or more features listed as characteristics of the system.

2. In the event that a complex system contains systems (subsystems), according to the structure and composition of the KTS or KTS, attributed to different categories of technical complexity, the complexity factor of such a system is calculated in accordance with clause 2.2. Calculations of the scope of work.

Appendix 2.2. Legend for the number of channels (part 2 section 1)


Appendix 2.2

Symbol

Name

Number of information analog channels

Number of information discrete channels

Number of analog control channels

Number of discrete control channels

The total number of information analog and discrete channels

The total number of analog and discrete control channels

The total number of information and control channels, analog and discrete


Appendix 2.3

Appendix 2.3. The coefficient of "metrological complexity" of the system (part 2 section 1)

Characteristics of the factors of "metrological complexity" (M) of the system

Designation
quantity
channels

Coefficient
"metrological complexity" of the system (M)

Measuring transducers (sensors) and measuring devices, etc., operating in a normal environment and technological environment, accuracy class:

less than or equal to 1.0

below 0.2 and above 1.0

greater than or equal to 0.2

Note.

If the system has measuring transducers (sensors) and measuring instruments belonging to different classes of accuracy, the coefficient is calculated by the formula:

Where:

Appendix 2.4. The coefficient of "development of information functions" of the system (part 2, section 1)


Appendix 2.4

Characteristics of the factors of "development of information functions" (I) of the system

Designation
quantity
channels

Coefficient
"development
information
tional
functions of the "system (I)

Parallel or centralized control and measurement of the state parameters of the technological control object (TOC).

The same as in claim 1, including archiving, documenting data, drawing up emergency and production (shift, daily, etc.) reports, presenting parameter trends, indirect measurement (calculation) of individual complex indicators of the TOC functioning.

Analysis and generalized assessment of the state of the process as a whole according to its model (recognition of the situation, diagnostics of emergency conditions, search for a "bottleneck", forecast of the process).

Note.

If the system has different characteristics of "development of information functions", the coefficient is calculated by the formula:

Where:

Appendix 2.5. Coefficient of "development of management functions" (part 2, section 1)

Appendix 2.5

Characteristics of the factors of "development of control functions" (U) of the system

Number of channels designation

The coefficient of "development of control functions" of the system (U)

Single-circuit automatic control (AR) or automatic single-cycle logical control (switching, blocking, etc.).

Cascade and (or) programmed AR or automatic programmed logical control (APLU) on a "hard" cycle, multi-connected AR or APLU on a cycle with branches.

Control of fast processes in emergency conditions or control with adaptation (self-learning and change of algorithms and system parameters) or optimal control (OC) of steady modes (in static), OC of transient processes or the process as a whole (optimization in dynamics).

Notes.

If the system has different characteristics of "development of control functions", the coefficient is calculated by the formula:

Where:

Appendix 2.6. Commissioning structure (part 2 section 1)

Appendix 2.6

The name of the stages of the commissioning

Share in total cost of work, %

Preparatory work, inspection of TCP (PS):

incl. preparatory work

Autonomous system setup

Complex commissioning of systems

Notes:

1. The content of the stages of work execution corresponds to clause 1.2.4. general provisions of FERp.

2. In the event that the customer engages one organization (for example, a project developer or an equipment manufacturer with appropriate licenses for commissioning) to perform commissioning work on software and hardware, and another commissioning organization for technical means, the distribution of volumes them work (within the total cost of work on the system), including the stages in Appendix 2.6, is carried out, as agreed with the customer, taking into account the total number of channels attributed to OB and TS.

Appendix 2.7. Channel groups (part 2 section 1)

Appendix 2.7

Channel group symbol

KPTSTOU
(KTS)

Analog and discrete control channels (and) transmission of control actions from KTS (KTS) to TOU. The number of control channels is determined by the number of actuators: diaphragm, piston, electrical single and multi-turn, motorless (cut-off), etc.

TOUKPTS
(KTS)

Analog and discrete information channels (and) converting information (parameters) coming from the technological control object (TOC) to the CPTS (KTS). The number of channels is determined by the number of measuring transducers, contact and non-contact signaling devices, position and equipment status sensors, limit and limit switches, etc., while the combined fire alarm sensor (PIC) is counted as one discrete channel.

OpKPTS
(KTS)

Analog and discrete information channels (and) used by the operator (Op) to influence the KTS (KTS). The number of channels is determined by the number of influencing elements used by the operator (buttons, keys, control dials, etc.) to implement the functioning of the system in the automated (automatic) and manual modes. remote control actuators without taking into account as channels of the influence organs KTS (KTS) used for tuning and other auxiliary functions (except for control): the keyboard of terminal devices, information and control panels, buttons, switches, etc., panels of multifunctional or multichannel devices of control panels POS, etc., as well as voltage switches, fuses and other auxiliary devices affecting the above and others technical means, the adjustment of which is taken into account by the prices of the FERp part 2.

KPTSOp
(KTS)

Analog and discrete channels (s) for displaying information coming from the KTS (KTS) to Op are not taken into account when determining the number of system channels, except for cases when the project provides for the display of the same technological parameters (equipment status) on more than one terminal device (monitor, printer, interface panel, information board, etc.). The adjustment of information displays on the first terminal device is taken into account by FERp of Part 2.

In this case, when displaying information on each terminal device in excess of the first, the displayed parameters (s) are taken into account with a factor of 0.025, with a factor of 0.01. Indicators (lamps, LEDs, etc.) of states and positions built into measuring transducers (sensors), contact or non-contact signaling devices, buttons, control keys, switches, as well as indicators of voltage presence of devices, recorders, terminal devices of shields, consoles, etc., the adjustment of which is taken into account by FERp Part 2.

SMS
N 1, N 2, ..., N

Communication channels (interaction) analog and discrete information (s) with adjacent systems, made according to separate projects. "The number of physical channels through which communication signals (interaction) with adjacent systems are transmitted: discrete - contact and non-contact direct and alternating current (except for coded ones) and analog signals, the values ​​of which are determined on a continuous scale, as well as, for the purpose of FERp part 2, coded (pulse and digital) ". Various types of voltage of the electrical system used as power sources for the APCS equipment (boards, consoles, actuators, information converters, terminal devices, etc.) are not taken into account as communication channels (interactions) with adjacent systems.

Appendix 2.8. Diagram of an automated technological complex (ATK)

Appendix 2.8

Appendix 2.9. Categories of AS complexity, taking into account the number of functions of the AS software (part 2, section 2)

Appendix 2.9

Number of speaker functions

St. 1 to 10

St. 10 to 49

St. 49 to 99

Appendix 2.10. Coefficients that take into account the number of remote nuclear power plants (part 2, section 2)

Appendix 2.10

The number of geographically remote facilities for NPP location

Coefficient

Appendix 2.11. Coefficients that take into account the peculiarities of the NPD of the nuclear power plant

Appendix 2.11

Name

Table number (rates)

Coefficient

Availability of individual external battery sources of emergency power supply.

02-02-004, 02-02-005

Performing commissioning under the technical guidance of the chief personnel of the enterprises - manufacturers of the AU.

02-02-006, 02-02-007

Fault-tolerant speakers. In the case of performing the commissioning on computer complexes that have a classification feature of complexity as fault-tolerant complexes.

02-02-004, 02-02-007

Disaster-resistant speakers. In the case of performing the commissioning on computer systems that have a classification feature of complexity as catastrophic complexes.

02-02-004, 02-02-007

When re-conducting preliminary tests after modernization of the AU.

The factor of accounting for the architecture of the plant, taking into account the peculiarities of the implementation of the commissioning work:

For PNR speakers using two or more processor servers based on any architecture;

For PNR speakers using a server cluster based on any architecture.

AC architecture accounting factor - for AC commissioning performed on Risc-architecture servers.

________________
* total share ratio

Appendix 2.12. Terms and definitions used in FERp Part 2

Appendix 2.12

Conditional
designation

Definition

Automated system

1. A system consisting of personnel and a set of means for automating their activities, which implements information technology for performing established functions.

2. A set of mathematical and technical means, methods and techniques that are used to facilitate and accelerate the solution of time-consuming tasks associated with information processing.

Automated process control system

An automated system that ensures the operation of an object due to the appropriate choice of control actions based on the use of processed information about the state of the object.

Automated technological complex

A set of jointly functioning technological control object (TOC) and the APCS controlling it.

Automatic mode of indirect control when performing the APCS function

The mode of performing the ACS TP function, in which the complex of automated process control systems automatically changes the settings and (or) settings of the local automation systems of the technological object of control.

Automatic mode of direct (direct) digital (or analog-digital) control when performing the control function of the APCS

The mode of performing the function of the automated process control system, in which the complex of automation equipment for the automated process control system develops and implements control actions directly on the actuators of the technological control object.

Autonomous setup of the speaker

The process of bringing the AU functions as a whole, their quantitative and (or) qualitative characteristics into conformity with the documentation on the commissioning.

Basic software configuration

A set of software functions due to the requirements of design solutions.

Basic setup ON

The process of bringing the software to the basic configuration.

Measuring transducer (sensor), measuring device

Measuring devices designed to obtain information about state of the process, designed to generate a signal that carries measurement information both in a form that is available for direct perception by an operator (measuring instruments) and in a form suitable for use in an automated process control system for the purpose of transmission and (or) transformation, processing and storage, but not amenable direct perception by the operator. To convert natural signals into unified signals, various normalizing converters are provided. Measuring transducers are divided into main groups: mechanical, electromechanical, thermal, electrochemical, optical, electronic and ionization. Measuring transducers are subdivided into transducers with natural, unified and discrete (relay) output signal (signaling devices), and measuring instruments - into devices with natural and unified input signal.

Installation

The process of installing (transferring) software to hardware.

Interface (or I / O interface)

A set of unified design, logical, physical conditions that must be satisfied by technical means so that they can be connected and exchange information between them.

In accordance with the purpose, the interface includes:

List of interaction signals and rules (protocols) for exchanging these signals;

Signal receiving and transmitting modules and communication cables;

Connectors, interface cards, blocks.

Information, control, notification, address and status signals are unified in the interfaces.

Information function of the automated control system

ACS function, including receiving information, processing and transmitting information to the ACS personnel or outside the system about the state of the TOU or external environment.

Information support of the automated system

A set of forms of documents, classifiers, regulatory framework and implemented solutions on the volume, placement and forms of existence of information used in the AU during its operation.

Executive device

Actuating devices (IU) are designed to influence the technological process in accordance with the command information of the KTS (KTS). The output parameter of the DUT in the APCS is the consumption of the substance or energy supplied to the TOU, and the input parameter is the KTS signal (KTS). In the general case, IUs contain an actuating mechanism (MI): electric, pneumatic, hydraulic and regulating body (RO): throttling, metering, manipulating. There are complete IUs and systems: with an electric drive, with a pneumatic drive, with a hydraulic drive and auxiliary devices of the IU (power amplifiers, magnetic starters, positioners, position indicators and control devices). To control some electrical devices (electric baths, large electric motors, etc.), the controlled parameter is the flow of electrical energy, and in this case the amplification unit plays the role of the DUT.

Actuating mechanism

Regulatory authority

Disaster-resistant speaker

AS, consisting of two or more remote server systems, functioning as a single complex using clustering and / or load balancing technologies. Server and support equipment is located at a considerable distance from each other (from units to hundreds of kilometers).

Complex adjustment of the AU

The process of bringing the NPP functions, their quantitative and (or) qualitative characteristics into compliance with the requirements of the TOR and design documentation, as well as identifying and eliminating shortcomings in the systems' actions. Complex adjustment of the AU consists in working out communication AC with external objects.

Configuration (computing system)

A set of functional parts of a computing system and the connections between them, due to the main characteristics of these functional parts, as well as the characteristics of the data processing problems being solved.

Configuring

Setting up the configuration.

Indirect measurement (calculation) of individual complex indicators of the functioning of the TOU

Indirect automatic measurement (calculation) is performed by converting a set of partial measured values ​​into a resulting (complex) measured value using functional transformations and subsequent direct measurement of the resulting measured value or by direct measurement of partial measured values ​​with subsequent automatic calculation of the resulting (complex) measured value by results of direct measurements.

Mathematical support of the automated system

A set of mathematical methods, models and algorithms used in the AS.

Metrological certification (calibration) of measuring channels (MC) of the process control system

MC must have metrological characteristics that meet the requirements of the accuracy standards, the maximum permissible errors. IC ACS TP are subject to state or departmental certification. The type of metrological certification must correspond to that established in the terms of reference for the automated process control system.

IK ACS TP are subject to state metrological certification, the measurement information of which is intended for:

Use in commercial transactions;

Accounting material values;

Protecting the health of workers, ensuring safe and harmless working conditions.

All other ICs are subject to departmental metrological certification.

Multilevel APCS

APCS, which includes as components of the APCS of different levels of the hierarchy.

General software of an automated system

A part of the AU software, which is a collection of software tools developed outside of connection with the creation of this AU.

Single-level APCS

APCS, which does not include other, smaller APCSs.

Optimal control

Control that provides the most advantageous value of a certain optimality criterion (CO), which characterizes the effectiveness of control under given constraints.

Various technical or economic indicators can be selected as CR:

Transition time (performance) of the system from one state to another;

Some indicator of product quality, the cost of raw materials or energy resources, etc.

DT example: In furnaces for heating billets for rolling, by optimally changing the temperature in the heating zones, it is possible to ensure minimum value root-mean-square deviation of the heating temperature of the processed workpieces when changing the rate of their advance, size and thermal conductivity.

Pilot operation of the NPP

Putting the NPP into operation in order to determine the actual values ​​of the quantitative and qualitative characteristics of the NPP and the readiness of personnel to work in the conditions of the NPP functioning, to determine actual effectiveness AC, corrections (if necessary) of documentation.

Failsafe speaker

AS, providing the possibility of functioning of application software and / or network services of systems with medium criticality, i.e. such systems, the maximum recovery time for which should not exceed 6-12 hours.

Parameter

An analog or discrete quantity that takes different values ​​and characterizes either the state of the ATC, or the process of functioning of the ATC, or its results.

Example: temperature in the working space of the furnace, pressure under the top, coolant flow rate, shaft rotation speed, voltage at the terminals, content of calcium oxide in raw meal, signal for assessing the state of the mechanism (unit), etc.

Preliminary tests of the speaker

Processes for determining the NPP operability and deciding on the possibility of NPP acceptance into trial operation. They are performed after the developer has debugged and tested the supplied software and hardware of the system, as well as the components of the AU and presented them with the relevant documents about their readiness for testing, as well as after familiarizing the NPP personnel with the operational documentation.

AC acceptance tests

AC compliance process terms of reference, assessing the quality of trial operation and resolving the issue of the possibility of accepting the nuclear power plant for continuous operation, including checking: the completeness and quality of the implementation of functions at standard, limiting, critical values ​​of the parameters of the automation object and in other conditions of the functioning of the nuclear power plant specified in the statement of work; fulfillment of each requirement related to the system interface; work of staff in an interactive mode; means and methods for restoring NPP operability after failures; completeness and quality of operational documentation.

An error has occurred

The payment was not completed due to a technical error, cash from your account
were not written off. Try to wait a few minutes and repeat the payment again.

STATE ESTIMATE STANDARDS

FERp 81-05-2001-I2

FEDERAL UNIT PRICES
FOR COMMISSIONING WORKS

FERp-2001

CHANGES,
WHICH ARE INCLUDED IN STATE ESTIMATE
REGULATIONS. FEDERAL UNIT PRICES
FOR COMMISSIONING WORKS

Moscow 2010

“Changes that are being made to the state budget standards. Federal unit rates for commissioning "contain changes and additions to the federal unit rates approved by order of the Ministry of Regional Development Russian Federation dated August 4, 2009 No. 321 "On approval of state estimate standards for the installation of equipment, overhaul equipment and commissioning ”.

DEVELOPEDFederal Center for Pricing in Construction and Industry building materials

APPROVED BYby order of the Ministry of Regional Development of the Russian Federation of December 21, 2010 No.№ 747

CHANGES TO BE MADE IN THE STATE
ESTIMATED STANDARDS. FEDERAL UNIT PRICES
FOR COMMISSIONING WORKS

To the section " I . General Provisions»Make the following changes and additions:

Clauses 1.2, 1.2.1, 1.2.2, 1.2.3, 1.2.4, 1.2.5, 1.2.6, 1.2.7 shall be amended as follows:

1.2. FERp part 2 "Automated control systems" are designed to determine the cost of commissioning automated systems management.

1.2.1. FERp Part 2 applies to:

automated process control systems (APCS);

centralized operational dispatch control systems;

automatic fire and security and fire alarm systems;

control and automatic control systems for fire extinguishing and smoke protection;

telemechanical systems;

hardware and software computing technology, in the part relating to the installation and configuration of the software.

FERp of part 2 of section 1 are not intended to determine direct costs in the estimated cost of work:

on precision in-line analyzers of physical and chemical properties of media and products circulating in the technological process: refractometers, chromatographs, octanometers and other similar single-use analyzers;

for video surveillance (security) systems using television installations, loud-speaking communications (alerts), etc., the direct costs of which are determined according to FERm, Part 10 "Communication Equipment".

1.2.2. Part 2 pricing is based on the following conditions:

complexes of software and hardware means (KTS) or complexes of technical means (KTS), transferred for commissioning - serial, complete, with loaded system and applied software, provided with technical documentation (passports, certificates, etc.), their storage period in the warehouse does not exceed the standard;

commissioning works are carried out on the basis of the approved by the customer working documentation, if necessary - taking into account the project for the production of work (PP P ), programs and graphics;

By the start of the start-up and commissioning organization's work, the customer has transferred the working design documentation, including parts of the APCS project:

software (MO), Information Support(IO), software (software), organizational support (OO);

start-up and commissioning works are started if the customer has completed documents installation works... In the event of forced interruptions between installation and commissioning work for reasons beyond the control of the contractor, commissioning work is started after checking the safety of previously installed and previously dismantled technical equipment (in this case, the completion certificate for installation work is drawn up anew on the start date of commissioning);

switching of operating modes of technological equipment is carried out by the customer in accordance with the project, regulations and during the periods provided for by the agreed programs and work schedules;

detected defects in the installation of software and hardware (PTS) or hardware (TS) are eliminated by the installation organization.

1.2.3. FERp part 2 was developed in accordance with the requirements of state standards, electrical installation rules, inter-branch rules on labor protection (safety rules) during the operation of electrical installations, safety rules for gas distribution and gas consumption systems, general explosion safety rules for explosive and fire hazardous chemical, petrochemical and oil refining industries and other rules and norms of state supervision bodies, technical documentation manufacturers of OB vehicles or vehicles, instructions, technical and technological regulations, guiding technical materials and other technical documentation for the installation, commissioning and operation of OB vehicles and vehicles.

1.2.4. In the prices of part 2 Division 1 the costs for the production of a complex of works for one technological cycle of commissioning works for the commissioning of an automated process control system are taken into account in accordance with the requirements of regulatory and technical documentation, including the following stages (stages):

1.2.4.1. Preparatory work, checking the KTS (KTS) of automated systems:

study of working and technical documentation, incl. materials of the pre-design stage ( technical requirements to the system, etc.), performance of other activities of engineering and technical preparation of work, inspection of the technological control object, external inspection of equipment and installation work performed on the APCS, determination of the readiness of systems adjacent to the APCS (power supply, etc.), etc. etc.

verification of the compliance of the main technical characteristics of the equipment with the requirements established in the passports and instructions of the manufacturers (the results of the inspection and adjustment are recorded in the certificate or passport of the equipment, the faulty PTS or TS are handed over to the customer for repair and replacement).

1.2.4.2. Autonomous adjustment of automated systems after completion of their installation:

verification of the installation of the PTS (TS) for compliance with the requirements of the manufacturer's instructions and working documentation;

replacement of individual defective elements with serviceable ones issued by the customer;

checking the correctness of marking, connection and phasing of electrical wiring;

phasing and control of the characteristics of actuators (MI);

setting up logical and temporal interconnections of alarm, protection, blocking and control systems, checking the correctness of the signal flow;

checking the functioning of applied and system software;

preliminary determination of the characteristics of the object, calculation and adjustment of the parameters of the equipment of automated systems, configuration of measuring transducers and program-logical devices;

preparation for switching on and putting into operation of measurement and control systems and control to ensure individual testing of technological equipment and adjustment of the settings for the equipment of control systems in the course of their operation;

registration of production and technical documentation.

1.2.4.3. Complex adjustment of automated systems:

bringing the settings of the PTS (TS), communication channels and application software to values ​​(states) at which automated systems can be used in operation, while being carried out in a complex:

determination of the conformity of the procedure for testing devices and elements of alarm systems, protection and control to algorithms of working documentation with the identification of the reasons for their failure or "false" operation, installation required values actuation of positioning devices;

determination of the compliance of the throughput of the shut-off and control valves with the requirements of the technological process, the correctness of the operation of limit and limit switches, position and state sensors;

determination of the flow characteristics of regulatory bodies (RO) and bringing them to the required norm using the adjustment elements available in the design;

clarification of the static and dynamic characteristics of the object, adjustment of the values ​​of the system settings, taking into account their mutual influence during operation;

preparation for inclusion in the operation of systems to ensure comprehensive testing of technological equipment;

testing and determination of suitability automated systems to ensure the operation of technological equipment with a performance that meets the standards for the development of design capacities in the initial period;

analysis of the work of automated systems;

preparation of production documentation, act of acceptance into operation of systems;

introduction of changes into one copy of the schematic diagrams from the set of working documentation, agreed with the customer, based on the results of commissioning.

1.2.5. In the prices of part 2 Division 1 not taken into account the costs of: commissioning, the prices for which are given in

the relevant sections of the FERp Part 1 "Electrical Devices": for electrical machines (motors) of electric drives, switching devices, static converters, power devices, measurements and tests in electrical installations;

testing of automated systems in excess of 24 hours of their operation during the period of complex testing of technological equipment;

drawing up technical report and estimate documentation;

delivery of measuring instruments to the state verification;

configuring components and screen forms, adjusting and finalizing the design mathematical, information and software, determined based on standards for design work;

revision of PTS (TS), elimination of their defects (repair) and installation defects, including bringing the insulation of electrical equipment, cable communication lines and the parameters of mounted fiber-optic and other communication lines up to standards;

checking the compliance of wiring diagrams with schematic diagrams and making changes to wiring diagrams;

drawing up of basic, installation, detailed diagrams and drawings;

partial or complete remounting of cabinets, panels, consoles;

carrying out physical, technical and chemical analyzes, supply of exemplary mixtures, etc .;

drawing up a program for complex testing of technological equipment;

training of operating personnel;

development of operational documentation;

technical (service) maintenance and periodic checks of the KTS (KTS) during the operation.

1.2.6. Part pricing 2 divisions 1 developed for automated systems (hereinafter referred to as systems), depending on the category of their technical complexity, characterized by the structure and composition of the CTS (CTS).

1.2.7. Part pricing 2 Division 1 designed for systems I, II and III category of technical complexity, depending on the number of communication channels for the formation of input and output signals.

The communication channel for the formation of input and output signals (hereinafter referred to as the channel) includes a set of technical means and communication lines that ensure the transformation, processing and transmission of information for use in the system.

The prices take into account the number of channels:

informational (including channels of measurement, control, notification, address, status, etc.);

management.

As part of information channels and control channels, in turn, the number of channels is taken into account:

discrete - contact and non-contact on alternating and direct current, pulsed from discrete (signaling) measuring transducers, for monitoring the status of various two-position devices, as well as for transmitting signals of the “on-off” type, etc .;

analog, which include (for the purposes of FERp Part 2 Division 1) all others - current, voltage, frequency, mutual inductance, natural or unified signals of measuring transducers (sensors) that change continuously, coded (pulse or digital) signals for information exchange between various digital information processing devices, etc.

In the further presentation, the symbols for the number of channels given in Appendix 2.2 are used.

Supplement the section " I ... General provisions "clauses 1.2.8, 1.2.9, 1.2.10, 1.2.11 of the following content:

1.2.8. The prices for part 2 of section 2 take into account the costs of performing the following independent completed processes of commissioning:

installation and basic configuration of general and special software for the speaker;

functional setting of general and special software of the speaker;

autonomous setup of the AU;

complex adjustment of the AU;

conducting preliminary and acceptance tests of the nuclear power plant.

1.2.9. The prices for part 2 of section 2 do not include the costs of:

work on revision of hardware, elimination of their defects and installation defects, deficiencies in construction and installation work;

design and engineering work;

repeated tests;

development of operational and estimate documentation;

trial operation;

delivery of measuring instruments to the state verification;

coordination of the work performed with the supervisory authorities;

maintenance and Maintenance Vehicle during the period of commissioning.

1.2.10. Part 2 Division 2 pricing is designed for systems I, II, IIIandIVcategories of technical complexity, depending on the number of software functions used to create the AU.

1.2.11. Terms and definitions used in FERp Part 2 are given in Appendix 2.12.

Introduce the following changes and additions to the Federal Unit Prices for Commissioning:

Rates numbers

Name and technical specifications equipment

Direct costs (remuneration of commissioning personnel), rubles

Labor costs man-hours

Part 2 "AUTOMATED CONTROL SYSTEMS"

supplement with department 02 tables 02-02-001, 02-02-002, 02-02-003, 02-02-00 4,02-02-005,02-02-006, 02-02-007

SECTION 02. HARDWARE AND SOFTWARE COMPUTER EQUIPMENT

Table 02-02-001. Installation and basic setup of general and special software

Meter: 1 installation

02-02-001-01

Installation and basic setup of general and special software

39,10

2,49

Table 02-02-002. Functional setting of common speaker software

Meter: 1 function

02-02-002-01

Functional setting of the general software of the speaker, the number of functions - 1

61,30

Table 02-02-003. Functional setting of the special software of the speaker

Meter: 1 function

02-02-003-01

Functional setting of the special software of the speaker, the number of functions - 1

43,39

2,76

Table 02-02-004. Autonomous setup of the speaker

Meter: 1 system

Autonomous setup of the speaker:

02-02-004-01

I difficulty categories

82,39

5,25

02-02-004-02

II difficulty categories

371,67

23,63

02-02-004-03

III difficulty categories

743,39

47,28

02-02-004-04

IV difficulty categories

1486,84

94.56

Table 02-02-005. Complex adjustment of the AU

Meter: 1 system

Complex adjustment of the AU:

02-02-005-01

I difficulty categories

70,76

02-02-005-02

II difficulty categories

353,78

22,5

02-02-005-03

III difficulty categories

703,66

45,01

02-02-005-04

IV difficulty categories

1415,77

90,04

Table 02-02-006. Preliminary tests of the speaker

Meter: 1 system

Preliminary tests of the speaker:

02-02-006-01

I difficulty categories

100,01

6,37

02-02-006-02

II difficulty categories

500,56

31,85

02-02-006-03

III difficulty categories

1000,78

63,68

02-02-006-04

IV difficulty categories

1962,68

127,34

Table 02-02-007. AC acceptance tests

Meter: 1 system

AC acceptance tests:

02-02-007-01

I difficulty categories

189,84

12,07

02-02-007-02

II difficulty categories

949,22

60,37

02-02-007-03

III difficulty categories

1897,99

120,74

02-02-007-04

IV difficulty categories

3796,30

241,45

To the section " IV ... Appendices "the following changes and additions have been made:

Appendices 2.1-2.7 shall be stated in the following edition:

Automated control systems

Appendix 2.1

System characteristics (structure and composition of KTS or KTS)

System complexity factor

Single-level information, control, information and control systems, characterized in that measuring and control devices, electromagnetic, semiconductor and other components, signal fittings, etc. are used as components of the CTS to perform the functions of collecting, processing, displaying and storing information and generating control commands .NS. instrument or hardware types of execution

Single-level information, control, information and control systems, characterized in that programmable logic controllers (PLC), intrasystem communication devices, microprocessor operator interfaces (panels display)

Single-level systems with automatic mode of indirect or direct (direct) digital (digital-to-analog) control using object-oriented controllers with programming of settings parameters, for the functioning of which the development of project hardware and software is not required

Information, control, information and control systems in which the composition and structure of the CTS meet the requirements established for classifying systems to the I category of complexity and in which fiber-optic information transmission systems (FOTS) are used as communication channels

Measuring systems (measuring channels) for which metrological certification (calibration) is required according to the project

Multilevel distributed information, control, information and control systems, in which the composition and structure of the local-level CPTS meet the requirements established for classifying the system as the II category of complexity and in which process (PCS) or operator (OS) are used to organize subsequent control levels stations, implemented on the basis of problem-oriented software, interconnected with each other and with the local control level by means of local computer networks

Information, control, information - control systems, in which the composition and structure of the CTS (CTS) meets the requirements established for classifying systems to the II category of complexity and in which fiber-optic information transmission systems (FOTS) are used as communication channels

Notes:

2. In the event that a complex system contains in its composition systems (subsystems), according to the structure and composition of the CTS or CTS, attributed to different categories of technical complexity, the complexity factor of such a system is calculated in accordance with clause 2.2. Calculations of the scope of work

Appendix 2.2

Legend for the number of channels (part 2 section 1)

Symbol

Name

Number of information analog channels

Number of information discrete channels

Number of analog control channels

Number of discrete control channels

The total number of information analog and discrete channels

The total number of analog and discrete control channels

The total number of information and control channels, analog and discrete

Appendix 2.3

The coefficient of "metrological complexity" of the system (part 2 section 1)

Characteristics of the factors of "metrological complexity" (M) systems

The coefficient of "metrological complexity" of the system (M)

Measuring transducers (sensors) and measuring devices, etc., operating in a normal environment and technological environment, accuracy class:

lower or equal 1,0

below 0,2 and higher 1,0

higher or equal 0,2

Note.

If the system has measuring transducers (sensors) and measuring instruments belonging to different classes of accuracy, the coefficient M is calculated by the formula:

where:

(4.1)

Appendix 2.4

The coefficient of "development of information functions" of the system (part 2, section 1)

Characteristics of the factors of "development of information functions" (I) of the system

Number of channels designation

The coefficient of "development of information functions" of the system (AND)

Parallel or centralized control and measurement of the state parameters of the technological control object (TOC)

The same as in claim 1, including archiving, documenting data, drawing up emergency and production (shift, daily, etc.) reports, presenting parameter trends, indirect measurement (calculation) of individual complex indicators of the operation of the TOU

Analysis and generalized assessment of the state of the process as a whole according to its model (recognition of the situation, diagnostics of emergency conditions, search for a "bottleneck", forecast of the process)

Notes.

If the system has different characteristics"Development of information functions", the coefficient And is calculated by the formula:

where:

(5.1)

Appendix 2.5

Coefficient of "development of management functions" (part 2, section 1)

Characteristics of the factors of "development of management functions" (Ooh) systems

Number of channels designation

The coefficient of "development of control functions" of the system (Ooh)

Single-circuit automatic control (AR) or automatic single-cycle logical control (switching, blocking, etc.).

Cascade and (or) programmed AR or automatic programmed logic control (ALLU) on a "hard" cycle, multi-connected AR or APLU on a cycle with branches.

Control of fast processes in emergency conditions or control with adaptation (self-learning and change of algorithms and system parameters) or optimal control (OC) of steady modes (in static), OC of transient processes or the process as a whole (optimization in dynamics).

Notes.

If the system has different characteristics of "development of control functions", the coefficient Y is calculated by the formula:

where:

(7.1)

Appendix 2.6

Commissioning structure (part 2 section 1)

The name of the stages of the commissioning

Share in the total cost of work,%

Preparatory work, inspection of TCP (PS):

incl. preparatory work

Autonomous system setup

Complex commissioning of systems

Notes:

2. In the event that the customer engages one organization (for example, a project developer or an equipment manufacturer with appropriate licenses for commissioning) to perform commissioning work on software and hardware, and another commissioning organization for technical means, the distribution of volumes them work (within the total cost of work on the system), including the stages in Appendix 2.6, is carried out, as agreed with the customer, taking into account the total number of channels attributed to OB and TS.

Appendix 2.7

Channel groups (part 2 section 1)

Channel group symbol

KPTS → TOU

(KTS)

Control channels analog and discrete transmission of control actions from KTS (KTS) to TOU. The number of control channels is determined by the number of actuators: diaphragm, piston, electrical one - and multi-turn, non-motor (cut-off), etc.

TOU → KPTS

(KTS)

Conversion of information (parameters) coming from the technological control object (TOC) to KTS (KTS). The number of channels is determined by the number of measuring transducers, contact and non-contact signaling devices, position and equipment status sensors, limit and limit switches, etc. in this case, the combined fire alarm sensor (POS) is counted as one discrete channel

Op → KPTS

(KTS)

Analog and discrete information channels used by the operator (Op) to influence the KTS (KTS). The number of channels is determined by the number of influencing elements used by the operator (buttons, keys, control dials, etc.) to implement the functioning of the system in the modes of automated (automatic) and manual remote control of actuators without taking into account the KTS (KTS) as the channels of the impact organs, used for setting and other auxiliary functions (except for control): keyboard of terminal devices of information and control panels, buttons, switches, etc., panels of multifunctional or multichannel devices of control panels of POS, etc., as well as voltage switches, fuses and other auxiliary organs of influence of the above and other technical means, the adjustment of which is taken into account by the prices of FERp Part 2.

KPTS → Op

(KTS)

Analog and discrete display channels of information coming from KTS (KTS) to Op are not taken into account when determining the number of system channels, except for cases when the project provides for displaying the same technological parameters (equipment status) on more than one terminal device (monitor, printer, interface panel, information board, etc.). The adjustment of information displays on the first terminal device is taken into account by FERp of Part 2.

In this case, when displaying information on each terminal device in excess of the first, the displayed parameters are taken into account with a factor of 0.025, with a factor of 0.01.

Indicators (lamps, LEDs, etc.) of states and positions built into measuring transducers (sensors), contact or non-contact signaling devices, buttons, control keys, switches, as well as indicators of voltage presence of devices, recorders, terminal devices of shields, consoles, etc., the adjustment of which is taken into account by FERp Part 2.

SMS

№ 1, № 2, ..., № i

Communication channels (interaction) analog and discrete information with adjacent systems, made according to separate projects. “The number of physical channels through which communication signals (interaction) with adjacent systems are transmitted: discrete - contact and non-contact direct and alternating current (except for coded ones) and analog signals, the values ​​of which are determined on a continuous scale, as well as, for the purpose of FERp part 2, coded (pulse and digital) ". Various types of electrical system voltage used as power supplies for APCS equipment (boards, consoles, actuators, information converters, terminal devices, etc.) are not taken into account as communication channels (interactions) with adjacent systems.

Appendix 2.9 shall be stated as follows:

Appendix 2.9

Supplement with applications 2.10-2.12:

Appendix 2.10

Coefficients that take into account the number of remote nuclear power plants (part 2, section 2)

Appendix 2.11

Coefficients that take into account the peculiarities of the NPD of the nuclear power plant

Name

Table number (rates)

Coefficient

Availability of individual external battery sources of emergency power supply.

Performing commissioning under the technical guidance of the chief personnel of the plant manufacturers of the AU.

Fault-tolerant speakers. In the case of performing the commissioning on computer systems that have a classification feature of complexity as fault-tolerant complexes.

Disaster-resistant speakers. In the case of performing the commissioning on computer systems that have a classification feature of complexity as catastrophic complexes.

When re-conducting preliminary tests after modernization of the AU.

AC architecture accounting factor, taking into account the specifics of the commissioning

For PNR speakers using two or more processor servers based on any architecture;

For commissioning and control systems using a server cluster based on any architecture

AC architecture accounting factor - for AC commissioning performed on Rise-architecture servers.

02-02-001(*)

(*) total share ratio

Appendix 2.12

Terms and definitions used in FERp Part 2

Designation

Definition

Automated system

AS

1. A system consisting of personnel and a set of automation tools for its activities, which implements information technology for performing established functions

2. A set of mathematical and technical means, methods and techniques that are used to facilitate and accelerate the solution of time-consuming tasks associated with information processing.

Automated process control system

APCS

An automated system that ensures the operation of an object due to the appropriate choice of control actions based on the use of processed information about the state of the object

Automated technological complex

A set of jointly functioning technological control object (TOC) and the process control system that controls it

Automatic mode of indirect control when performing the APCS function

The mode of performing the function of the process control system, in which the complex of means of automation of the process control system automatically changes the settings and (or) settings of the local automation systems of the technological object of control.

Automatic mode of direct (direct) digital (or analog-digital) control when performing the control function of the process control system

The mode of performing the function of the process control system, in which the complex of means of automation of the process control system develops and implements control actions directly on the actuators of the technological control object.

Autonomous setup of the speaker

The process of bringing the AU functions as a whole, their quantitative and (or) qualitative characteristics into conformity with the documentation on the commissioning.

Basic software configuration

The set of software functions due to the requirements of design solutions

Basic software setup

The process of bringing the software to the basic configuration

Measuring transducer (sensor), measuring device

Measuring devices designed to obtain information about the state of the process, designed to generate a signal that carries measuring information both in a form accessible for direct perception by an operator (measuring instruments) and in a form suitable for use in an automated process control system for the purpose of transmission and (or ) transformation, processing and storage, but not amenable to direct perception by the operator. To convert natural signals into unified signals, various normalizing converters are provided. Measuring transducers are divided into main groups: mechanical, electromechanical, thermal, electrochemical, optical, electronic and ionization. Measuring transducers are subdivided into transducers with natural, unified and discrete (relay) output signal (signaling devices), and measuring instruments - into devices with natural and unified input signal.

Installation

The process of installing (transferring) software to hardware.

Interface (or I / O interface)

A set of unified design, logical, physical conditions that must be satisfied by technical means so that they can be connected and exchange information between them.

In accordance with the purpose, the interface includes:

a list of interaction signals and rules (protocols) for exchanging these signals;

modules for receiving and transmitting signals and communication cables;

connectors, interface cards, blocks;

The interfaces unified information, control,

warning, address and status signals.

Information function of the automated control system

ACS function, including the receipt of information, processing and transmission of information to the ACS personnel or outside the system about the state of the TOU or the external environment

Information support of the automated system

A set of forms of documents, classifiers, regulatory framework and implemented solutions for the volume, placement and forms of existence of information used in the AU during its operation

Executive device

Actuating mechanism

Regulatory authority

Yiwu

THEM

RO

Actuators (IU) are designed to influence the technological process in accordance with the command information of the KTS (KTS). The output parameter of the DUT in the APCS is the consumption of the substance or energy supplied to the TOU, and the input parameter is the KTS signal (KTS). In the general case, IUs contain an actuator (MI): electric, pneumatic, hydraulic and regulating body (RO): throttling, metering, manipulating. There are complete IUs and systems: with an electric drive, with a pneumatic drive, with hydraulic drive and auxiliary devices of the IU (power amplifiers, magnetic starters, positioners, position indicators and control devices). To control some electrical devices (electric baths, large electric motors, etc.), the controlled parameter is the flow of electrical energy, and in this case the amplification unit plays the role of the DUT.

Disaster-resistant speaker

AS, consisting of two or more remote server systems functioning as a single complex using clustering and / or load balancing technologies. Server and support equipment is located at a considerable distance from each other (from units to hundreds of kilometers).

Complex adjustment of the AU

book

The process of bringing the NPP functions, their quantitative and (or) qualitative characteristics into compliance with the requirements of the TOR and design documentation, as well as identifying and eliminating shortcomings in the systems' actions. Complex adjustment of the AU consists in working out the information interaction of the AU with external objects.

Configuration (computing system)

A set of functional parts of a computing system and the connections between them, due to the main characteristics of these functional parts, as well as the characteristics of the data processing problems being solved.

Configuring

Setting up the configuration.

Indirect measurement (calculation) of individual complex Indicators of the functioning of the TOU

Indirect automatic measurement (calculation) is performed by converting a set of partial measured values ​​into a resulting (complex) measured value using functional transformations and subsequent direct measurement of the resulting measured value or by direct measurement of partial measured values ​​with subsequent automatic calculation of the resulting (complex) measured value by results of direct measurements.

Mathematical support of the automated system

A set of mathematical methods, models and algorithms used in the AS

Metrological certification (calibration) of measuring channels (MC) of the process control system

MC must have metrological characteristics that meet the requirements of the accuracy standards, the maximum permissible errors. IK APCS are subject to state or departmental certification. The type of metrological certification must correspond to that established in the terms of reference for the process control system.

IK APCS are subject to state metrological certification, the measurement information of which is intended for:

use in commodity and commercial transactions;

accounting of material values;

protection of workers' health, provision of safe and harmless working conditions.

All other ICs are subject to departmental metrological certification.

Multilevel process control system

APCS, which includes as components of the APCS of different levels of the hierarchy.

General software of an automated system

Part of the AU software, which is a collection of software tools developed outside of connection with the creation of this AU

Single-level process control system

APCS, which does not include other, smaller APCS.

Optimal control

OU

Control that provides the most advantageous value of a certain optimality criterion (CO), which characterizes the effectiveness of control under given constraints.

Various technical or economic indicators can be selected as CR:

transition time (performance) of the system from one state to another;

some indicator of product quality, the cost of raw materials or energy resources, etc.

DT example: In furnaces for heating billets for sub-rolling by means of optimal temperature changes in the heating zones, it is possible to ensure the minimum value of the root-mean-square deviation of the heating temperature of the processed billets when changing the rate of their advance, size and thermal conductivity.

Pilot operation of the NPP

AC input in action in order to determine the actual values ​​of the quantitative and qualitative characteristics of the NPP and the readiness of personnel to work in the conditions of the NPP functioning, to determine the actual NPP efficiency, to correct (if necessary) the documentation.

Failsafe speaker

AS, providing the possibility of functioning of application software and / or network services of systems with medium criticality, i.e. such systems, the maximum recovery time for which should not exceed 6-12 hours.

Parameter

An analog or discrete quantity that takes different values ​​and characterizes either the state of the ATC, or the process of functioning of the ATC, or its results.

Example: temperature in the working space of the furnace, pressure with a half-head, coolant flow rate, shaft rotation speed, voltage at the terminals, content of calcium oxide in raw meal, signal for evaluating the state of the mechanism (unit), etc.

Preliminary tests of the speaker

Processes for determining the NPP operability and deciding on the possibility of NPP acceptance into trial operation. They are performed after the developer has debugged and tested the supplied software and hardware of the system, as well as NPP components and provided them with the relevant documents about their readiness for testing, as well as after familiarizing the NPP personnel with the operational documentation.

AC acceptance tests

The process of determining the compliance of the NPP with the technical specifications, assessing the quality of trial operation and resolving the issue of the possibility of accepting the NPP into continuous operation, including checking: the completeness and quality of the implementation of functions at standard, limiting, critical values ​​of the parameters of the automation object and in other conditions of the NPP functioning specified in the TK; fulfillment of each requirement related to the system interface; work of staff in an interactive mode; means and methods for restoring NPP operability after failures; completeness and quality of operational documentation.

Software

A set of programs on data carriers and policy documents, intended for debugging, functioning and checking the functionality of the software.

Operating software configuration

The set of software functions due to the requirements of the agreed documentation

Regulation software

Regulation of one or more quantities that determine the state of an object, according to predetermined laws in the form of functions of time or some parameter of the system.

Example. A quenching furnace in which the temperature, which is a function of time, changes during the quenching process according to a predetermined program.

Multiply connected automatic control system (AR)

AR system with several adjustable values, interconnected through the control object, regulator or load.

Example: Object - steam boiler: input quantities - water supply, fuel, steam consumption; output values ​​- pressure, temperature, water level.

Systems for measuring and (or) automatic regulation of the chemical composition and physical properties substances

Measured medium and measured value for determining the chemical composition of substances:

examples of measured values for gaseous environments are:

concentration of oxygen, carbon dioxide, ammonia, CO + CO2 + H2 (waste gases of blast furnaces), etc., for liquid Wednesday:

electrical conductivity of solutions, salts, alkalis, concentration of aqueous suspensions, salinity of water, pH, cyanide content, etc. Measured value and test medium for determining the physical properties of a substance:

Example measured value for water and solids: humidity, for liquid and pulp- density, for water- turbidity, for grease oils- viscosity, etc.

Special software automated system

Part of the AU software, which is a collection of programs developed for / for the creation / (s) of this AU.

Telemechanical system

Telemechanics combines the vehicle of automatic transmission over a distance of control commands and information about the state of objects with the use of special transformations for the effective use of communication channels. Telemechanics means provide information exchange between objects of control and an operator (dispatcher), or between objects and KPTS. The set of control point (CP) devices, controlled point (CP) devices and devices intended for the exchange of information between the CP and CP through the communication channel forms a complex of telemechanics devices. A telemechanical system is a set of telemechanics devices, sensors, information processing facilities, dispatching equipment and communication channels that perform the complete task of centralized control and management of geographically dispersed objects. For the formation of control commands and communication with the operator, the telemechanical system also includes information processing facilities based on the KPTS.

Terminal

1. A device for interaction of a user or operator with a computer system. The terminal consists of two relatively independent devices: input (keyboard) and output (screen or printing device).

2. In a local area network - a device that is a source or receiver of data.

Technological control object

Control object, including technological equipment and the technological process implemented in it

Remote accommodation

A detached building in which the modules of the software and hardware complex are installed, physically located far from the location of other modules of the software and hardware complex

Control function automated control system

ACS function, including obtaining information about the state of the TOU, assessing information, choosing control actions and their implementation

Information display devices

IOI

Technical means used to transmit information to a person - an operator.

IOIs are divided into two large groups: local or centralized presentation of information, which can coexist in the system in parallel (simultaneously), or only centralized presentation of information is used.

IOIs are classified according to the forms of presentation of information into:

signaling (light, mnemonic, sound);

showing (analog and digital);

registering for direct perception (alphanumeric and diagrammatic) and with coded information (on magnetic or paper);

screen (display): alphanumeric, graphic, combined.

Depending on the nature of the formation of local and target screen fragments, means of this type are divided into universal (fragments of an arbitrary fragment structure) and specialized (fragments of an unchanged shape with an intermediate carrier of the fragment structure).

With regard to the APCS, fragments can carry information about the current state of the technological process, about the presence of disturbances in the process of functioning of the automated technological complex, etc.

Functional software setting

The process of bringing the software into a working configuration

Function

Function is a software function used to achieve the requirements for the AU and aimed at performing a specific AU task described in the design solutions.

The calculations take into account only the functions achieved by purposeful manual action in the process of setting up the AS software described in the design solutions.

Functions implemented automatically when configuring the speaker (during the software installation process or present by default) and do not require the participation of a service technician are not included in the calculations

Human operator

Personnel directly managing the facility

MINISTRY OF REGIONAL DEVELOPMENT OF THE RUSSIAN FEDERATION

ORDER

On amendments to the order of the Ministry of Regional Development
Of the Russian Federation dated August 4, 2009 No.№ 321 "About the approval
state estimated standards for the installation of equipment,
equipment overhaul and commissioning "

In order to update the state estimated standards in the field of estimated rationing and pricing in the field of urban planning activities in accordance with the Regulations on the Ministry of Regional Development of the Russian Federation, approved by the Decree of the Government of the Russian Federation of January 26, 2005 No.№ 40 (Collected Legislation of the Russian Federation, 2005, No. 5, Art. 390; No. 13, Art. 1169; 2006, No. 6, Art. 712; No. 18, Art. 2002; 2007, No. 45, Art. 5488; 2008, No. 22, article 2582; No. 42, article 4825, No. 46, article 5337; 2009, No. 3, article 378; No. 6, article 738; No. 14, article 1669; No. 38, article 4497; 2010, No. 9, Art. 960; No. 22, Art. 2776; No. 25, Art. 3190; No. 26, Art. 3350; No. 28, Art. 3702; No. 31, Art. 4251), by order of the Ministry of Regional Development of the Russian Federation of April 11, 2008 No.№ 44 "On approval of the Procedure for the development and approval of standards in the field of estimated rationing and pricing in the field of urban planning" (registered by the Ministry of Justice of the Russian Federation on May 12, 2008, registration No. 11661, Bulletin of normative acts federal authorities executive power, 2008, No. 22) and by order of the Ministry of Regional Development of the Russian Federation dated August 20, 2009 No.№ 353 "On approval of the classification of estimated standards to be applied in determining the estimated cost of capital construction projects, the construction of which is financed with the involvement of the federal budget" (registered by the Ministry of Justice of the Russian Federation on October 2, 2009, registration No. 14940, Bulletin of normative acts of federal executive bodies, 2009 , No. 42), I order:

1. In the order of the Ministry of Regional Development of the Russian Federation dated August 4, 2009 No.№ 321 "On the approval of state estimated standards for the installation of equipment, overhaul of equipment and commissioning" (Bulletin of pricing and estimated rationing, 2009, No. 9) make the following changes:

a) in Appendix No. 1 in accordance with Appendix No. 1 to this Order;

b) in Appendix No. 2 in accordance with Appendix No. 2 to this Order;

c) in Appendix No. 3 in accordance with Appendix No. 3 to this Order;

d) in Appendix No. 4 in accordance with Appendix No. 4 to this Order.

2. To recommend to the executive authorities of the constituent entities of the Russian Federation, within two months from the date of publication of this order, to bring territorial unit prices in line with this order.

3. Control over the implementation of this order shall be entrusted to the Deputy Minister of Regional Development of the Russian Federation K.Yu. Royal.

And about. Minister V.A. Tokarev

Table 1

System characteristics

(structure and composition of KPTS or KTS)

System complexity factor

Single-level information, control, information and control systems, distinguished by the fact that as components of the CTS to perform the functions of collecting, processing, storing information and generating control commands, they use measuring and regulating devices, electromagnetic, semiconductor and other components, signal fittings and etc. instrumental or hardware types of execution.

Single-level information, control, information and control systems, distinguished by the fact that as components of the CTS to perform the functions of collecting, processing, displaying, storing information and generating control commands, they use programmable logic controllers (PLC), intra-system communication devices, microprocessor interfaces operator (display panel)

Single-level systems with an automatic mode of indirect or direct (direct) digital (digital-to-analog) control using object-oriented controllers with programming of settings and for the functioning of which the development of project hardware and software is not required.

Information, control, information and control systems in which the composition and structure of the CTS meet the requirements established for classifying systems to the I category of complexity and in which fiber-optic information transmission systems (FOTS) are used as communication channels

Systems for measuring and (or) automatic regulation of the chemical composition and physical properties of a substance

Measuring systems (measuring channels) for which metrological certification (calibration) is required according to the project

Multilevel distributed information, control, information and control systems, in which the composition and structure of the local-level CPTS meet the requirements established for classifying the system as the II category of complexity and in which process (PCS) or operator (OS) are used to organize subsequent control levels stations implemented on the basis of problem-oriented software, interconnected with each other and with the local control level by means of local computer networks.

Information, control, information and control systems in which the composition and structure of the CTS (CTS) meet the requirements established for classifying systems to the II category of complexity and in which fiber-optic information transmission systems (FOTS) are used as communication channels

Notes: 1. Systems of II and III categories of technical complexity may have one or more features listed as a characteristic of the system.

2. In the event that a complex system contains in its composition systems (subsystems), according to the structure and composition of the CTS or CTS, attributed to different categories of technical complexity, the complexity factor of such a system is calculated in accordance with clause 2.2.

1.10. Estimated norms are developed for systems of I, II and III categories of technical complexity, depending on the number of communication channels for the formation of input and output signals.

A communication channel for the formation of input and output signals (hereinafter referred to as a channel) should be understood as a set of technical means and communication lines that ensure the transformation, processing and transmission of information for use in the system.

The Collection takes into account the number of:

Information channels (including channels of measurement, control, notification, address, status, etc.);

Control channels.

As part of information channels and control channels, in turn, the number of channels is taken into account:

Discrete - contact and non-contact on alternating and direct current, pulse from discrete (signaling) measuring transducers, for monitoring the status of various two-position devices, as well as for transmitting command signals of the “on-off” type, etc .;

Analog, which include (for the purposes of this Collection) all the others - current, voltage, frequency, mutual inductance, natural or unified signals of measuring transducers (sensors) that change continuously, coded (pulse or digital) signals for the exchange of information between various digital information processing devices, etc.

How to correctly use the collection GESNp-2001-02 "Automated control systems" to determine the number of information channels in the implementation of commissioning works for the fire alarm. Our organization, guided by the table. No. 8 of the Technical part to the Collection of HPESNp-2001-02 "Automated control systems", "A manual for the preparation of estimate calculations (estimates) for commissioning work on automated control systems for technological processes (ACS TP), namely, chapter II" Comments on certain provisions of the collections GESNp-2001-02, FERp-2 ", Chapter III" Examples of determining the total number of information and control channels and labor costs ", Example No. 11" Determination of labor costs in the production of commissioning on the fire alarm system based on the receiving control panel ", calculates the number of information channels fire alarm systems by the number of smoke, heat and manual detectors.

Is this true?

Answer: Journal No. 1 (53), 2009 "Consultations and clarifications on pricing and estimated rationing in construction"

LLC "KCTsS", whose specialists are the developers of Compilations for the commissioning of HPPNp (FERp) -2001-02 "Automated control systems" and "Instructions for the application of federal unit prices for commissioning" (MDS 81-40.2006), "Guidelines for the preparation of estimates calculations (estimates) for commissioning for automated control systems (ACS TP) ", essentially the question asked, reports: In the absence of actuators in the fire alarm system, the number of channels is determined by 2 groups of information channels by the number of detectors, according to the principle of one sensor - one information discrete channel. The number of signal lines (loops) is not taken into account in the calculation of discrete information channels. When setting up (testing) and acceptance tests of the system, it is necessary to check the operation of each sensor in the signal lines (loops), along with other tests:

line insulation resistance measurement;

ohmic resistance measurement;

measurement of electrical parameters of operating modes ("duty", "break", "fire", "alarm");

measurement of electrical tests, including interaction with adjacent systems, ensuring stable and stable operation of the substation ("no false alarms") in accordance with the requirements of the project.

In the presence of related automation systems (automatic fire extinguishing systems, ventilation automation, etc.), made according to individual projects, information communication channels (interaction) are taken into account for 5 groups of ...

  • Sample Program Requirements 50> General Program Requirements 57 III. Primary measurement of social characteristics 63> construction of a measurement standard

    Software Requirements

    Check them compliance with reality. In conclusion, we briefly state what presents... links between comparable characteristics, i.e. coherence of qualitative classifications. Coefficient Chuprova (T- coefficient) will allow for that ...

  • Biology system of levels of organization of life

    Document

    Demonstrates technical possibilities of “reading ... categories self-organizing dissipative systems... An important feature of the latter is them... The specified complexity on- ... characteristics them ... presented in tabl... 8-1. ... for example coefficient growth heritability ...

  • V.P.Solovyova Doctor of Economics

    Document

    Due to the migratory influx. Characteristic age and sex structure of the population presented in tabl... 13. Table 13 ... 0.20 3 Quality of service Coefficient satisfaction with the state of material technical base (available to the consumer) 0.41 ...

  • Automated systems are now increasingly used in a variety of areas of activity. The possibility of introducing automated control systems for small and large industries is gaining high relevance.



    General concepts of an automated system

    An automated system, abbreviated AS, is a system that includes a control object and control systems, some functions in such systems are assigned to a person. AS is an organizational and technical system that guarantees the development of solutions based on the automation of information processes in all kinds of industries (production, management, design, economics).

    All functions of automated systems are aimed at achieving a specific goal through specific actions and activities. The fundamental goal of the AU is the most effective use of the capabilities and functions of the control object.

    The goals are as follows:

    • Providing the relevant data needed to make a decision.
    • Faster and better information collection and processing.
    • Reducing the number of decisions that must be made by the decision maker (DM).
    • Increased control and disciplinary level.
    • Operational management.
    • Reducing the costs of decision makers for the implementation of processes.
    • Clearly informed decisions.

    Classification of automated systems

    The main distinguishing features, according to which the classification of automated systems is carried out:

    • The sphere in which the object of management functions: construction, industry, non-industrial sphere, agriculture.
    • Type of workflow: organizational, economic, industrial.
    • The level in the public administration system.

    Categories of automated systems

    The classification of structures of automated systems in the industrial sphere is divided into the following categories:

    Decentralized structure. A system with this structure is used to automate independent control objects and is the most effective for these purposes. The system has a complex of independent systems with an individual set of algorithms and information. Each performed action is carried out exclusively for its control object.

    Centralized structure. Implements everything necessary processes management in unified system collecting and structuring information about control objects. Based on the information received, the system draws conclusions and makes an appropriate decision, which is aimed at achieving the original goal.

    Centralized dispersed structure. The structure operates according to the principles of a centralized management method. For each control object, control actions are generated based on data on all objects. Some devices can be shared for channels.

    The control algorithm is based on a set of general control algorithms that are implemented using a set of related control objects. During operation, each control element receives and processes data, and also transmits control signals to objects. The advantage of the structure is the less stringent requirements regarding the productivity of the processing and control centers, without prejudice to the management process.

    Hierarchical structure. In connection with the increase in the number of tasks in the management of complex systems, the algorithms being worked out become much more complicated. As a result, it becomes necessary to create a hierarchical structure. Such a formation significantly reduces the difficulties in managing each object, however, it is required to coordinate the decisions they make.

    Types of automated systems

    Depending on the functions performed by the AIS, the following types of automated systems are distinguished:

    • ACS- enterprise management systems.
    • APCS- process control systems.
    • ACSUP- production preparation systems.
    • OASUindustry systems management.
    • organizational and administrative.
    • ASK- product quality control systems.
    • GPS- flexible production systems.
    • CNC- machine tool control systems with numerical software.
    • groups of systems or integrated systems.

    Automated information systems

    An automated information system is a set of hardware and software tools necessary for the implementation of data storage and management functions, as well as for computing operations.

    The main purpose of AIS is to store data, to ensure high-quality search and data transfer, depending on the requests for the best match of user requests.

    The most important principles of process automation are identified:

    1. reliability;
    2. payback;
    3. flexibility;
    4. safety;
    5. compliance;
    6. friendliness.

    The classification of automated information systems has the following structure:

    1. A system that covers one process in an organization.
    2. Several processes are in progress from the organization.
    3. Normal operation of one process in several interconnected organizations at once.
    4. A system that organizes the functioning of several processes in several interconnected systems.

    Classification by degree of automation

    Information systems are also classified according to the degree of automation of the operations performed:

    • manual;
    • automated;
    • automatic.

    Manual - they lack modern means for processing information, and all operations are carried out by a person in manual mode.

    Automatic - absolutely all information processing operations are carried out using technical means without human intervention.

    Automated information systems perform operations both with the help of technical means and with the help of a person, however, the main role is transferred to the computer. IP is classified by the degree of automation, as well as by the scope and nature of the activity.

    Automated system levels

    There are three levels of automated control systems:

    Lower level. Equipment. At this level, attention is paid to sensors, measuring and actuating devices. Here, signals are coordinated with the inputs of devices and commands with executive devices.

    Average level. Controller level. The controllers receive data from the measuring equipment, and then transmit signals for control commands, depending on the programmed algorithm.

    Top level- industrial servers and dispatching stations. Production control is carried out here. For this, communication with lower levels, collection of information and monitoring of the technological process are provided. This level interacts with a person. A person here controls the equipment using a human-machine interface: graphic panels, monitors. The control over the system of machines is provided by the SCADA system, which is installed on the dispatching computers. This program collects information, archives it and visualizes it. The program independently compares the received data with the specified indicators, and in case of discrepancy, it notifies the human operator about the error. The program records all operations, including the operator's actions, which are necessary in the event of an emergency. This ensures the control of the operator's responsibility.

    There are also critical automated systems. These are systems that implement various information processes in critical control systems. Criticality is a likely danger of disrupting their stability, and system failure is fraught with significant economic, political or other damage.

    What concerns the critical automated processes? The following control systems are referred to as critical: hazardous industries, nuclear facilities, space flight control, railway traffic, air traffic, military and political control. Why are they critical? Because the tasks they solve are critical: the use of information with limited access, the use of biological and electronic means information processing, the complexity of technological processes. Consequently, automated information systems become an element of critical control systems and, as a result, have received belonging to this class.

    conclusions

    Summing up, we can note the importance of automation of control systems in various fields. Today, the introduction of such systems provides better production management, minimizing human participation in these processes and thereby eliminating errors associated with the human factor. The development and development of automated control systems makes it possible to improve many areas: production, economics, energy, transport, and others.

    SYSTEM OF REGULATORY DOCUMENTS IN CONSTRUCTION

    ESTIMATE STANDARDS
    RUSSIAN FEDERATION

    FERp 81-04-02-2001

    Approved and introduced in de th seizure with 16 apr l I 2003 G.
    by decree Gosstroy Of Russia from
    16 . 04 . 2003 G . 35

    FEDERAL
    SINGLE PRICES
    ON START
    H A LA DAUGHTER WORKS

    FERp-2001

    Collection No.2

    AUTOMATED SYSTEMS
    MANAGEMENT

    State Committee of the Russian Federation
    for construction and housing
    n o-comm n al complex
    (Gosstroy of Russia)

    Moscow2003G.

    Federal unit rates for commissioning O chnye works FERp-2001-02 Automated control systems.

    (Gosstroy of Russia) Moscow, 2003G.

    Designed to determine direct costsT in the estimated cost, as well as for calculations for the completed commissioning of automated control systems.

    The collection is designed at the price level1-th territorial region as of January 1, 2000.

    DEVELOPEDFSUE TsNIIEUS Gosstroy of Russia (Zh.G. ChernNS Shova, L.V. Razmadze), OJSC "Association Monta zhavtomatika "(B .Z ... Barlasov, M.I. Logoiko), LLC "Coordination Center for Pricing and Estimated Rationing in Construction" (A.N. Zhukov) with the participation of Interregional Center on pricing in the construction and building materials industry (MCTsS) of the Gosstroy of Russia (V.NS. Shuppo).

    CONSIDEREDThe Department of Pricing and Estimated Rationing of the Gosstroy of Russia (Editorial Commission: V.A. Stepanov - Head, V.G.Kozmodemyanskiy, T.L. Gr ischenkova).

    INTRODUCEDDepartment of Pricing and Estimated Rationing of the Gosstroy of Russia.

    APPROVED AND COMMISSIONED from 16 ... 04.200316.04.2003 # 35

    FEDERAL UNIT PRICES
    ON PUSKONA
    L ADDITIONAL WORKS

    Collection 2

    Automated control systems

    FERp-2001-02

    TECHNICAL PART

    1... General Provisions

    1. 1... These federal unit prices (hereinafter - prices) are intended to determine direct costs in the estimated cost of the start-up okay х works on automated control systems at the existing enterprises, buildings and structures being put into operation, under construction, as well as reconstructed, expandable and technically re-equipped enterprises.

    1. 2... Prices reflect the industry average level of technology and organization of commissioning s works.

    The prices are obligatory for application by all enterprises and organizations, regardless of their departmental affiliation and forms of ownership, which carry out capital construction at the expense of the state budget of all levels and targeted off-budget funds.

    For construction projects, financing of which is carried out at the expense of the own funds of enterprises, organizations and individuals, the prices of this collection are of a recommendatory nature.

    1. 3... Prices are based on:

    Collection of State Elemental Estimated Standards for Start-up l and daughters e works - GESNp-2001-02 "Automated control systems", approved and put into effect since July 15, 2001 by the decree of the Gosstroy of Russia from July 23, 2001 No. 84;

    The wage level of the start-upl admission personnel hired on the basis of state statistical reporting in construction in the first territorial region as of January 1, 2000.

    1. 4... When applying this collection, in addition to the provisions contained in this technical part, it is necessary to take into account the general requirements given in the Instructions for the application of federal unit prices for commissioning, approved and put into effect by the Gosstroy of Russia.

    1. 5... This Collection applies to:

    Automated process control systems (ACS TP);

    Centralized operational dispatch control systems;

    Automatic fire and security and fire alarm systems;

    Control and automatic control systems for fire extinguishing and antidotesmoke protection;

    Telemechanical systems.

    The collection is not intended to determine direct costs in the estimated cost of work:

    For precision in-line analyzers of physical and chemical properties of media and products circulating in the technological process: refractometers, chromatographs, octane meters and other similar single-use analyzers;

    For complexes of software and hardware of computing centers, economic or other information not related to technological processes;

    For video surveillance (security) systems using television installations, loud-speaking communications (alerts), etc., the direct costs of which are determined according to the Collection for the installation of equipment No. 10 "Communication Equipment".

    (Modified edition. Amendment No. 1)

    1. 6... The prices are based on the following conditions:

    Complexes of software and hardware tools (KPTS) orTo complexes of technical means ( TO TS) transferred for commissioning - serial, complete, with loaded system and application software, provided with technical documentation (passports, certificates, etc.), their storage period in the warehouse does not exceed the standard;

    Commissioning works are carried out by organizations licensed to carry out these types of work, when performing work at facilities supervised by state supervision bodies, there are additionally licenses and / or permits from these departments. Workers performing work have qualifications corresponding to the technical complexity of automated systems, have passed the necessary training, attestation or certification, are provided with the necessary equipment, measuring instruments, control and test stands, instrumental software, programmers, calibrators, tools, personal protective equipment, etc. .;

    Puscon L adolescents e works are carried out on the basis of the working documentation approved by the customer, if necessary - taking into account the project for the production of works (P NS R), programs and graphics;

    By the beginning of the start-up workd full-time organization, the customer transferred working design documentation, including parts of the APCS project: software (MO), information support (IO), software (SW), organizational support (OO);

    To start-up production l ado s x work begins if the customer has documents on the completion of installation work, provided for by SNi NS (acts, protocols, etc.). In the event of forced breaks between installation and commissioning work for reasons beyond the control of the contractor, to start-up okay m work begins after checking the safety of previously installed and previously dismantled technical means (in this case, the certificate of completion of installation work is drawn up anew as of the start date of commissioning);

    Switching of operating modes of technological equipment is made by the customer in accordance with the project, regulations and during the periods provided for by the agreed programs and work schedules;

    The detected defects in the installation of software and hardware (PTS) or hardware (TS) are eliminated by the installation organization.

    (Modified edition. Amendment No. 1)

    1. 7... Prices are developed in accordance with the requirements state standards, in particular, GOST 34. 603- 92 « Information technology... Types of tests of automated systems ", standards" State system industrial devices and automation equipment "," State system for ensuring the uniformity of measurements ", 3-th part of SNiP "Organization, production and acceptance of work", Rules for the installation of electrical installations (PUE), Interindustry rules on labor protection (safety rules) during the operation of electrical installations (POTRM- 016-2001) RD 153-34.0-03.150-00,"Safety Rules for Gas Distribution and Gas Consumption Systems" (PB-12-529-03. О general rules of adult NS in safety for adults flammable х chemical, petrochemical and oil refining industries (PB 09-540-03) and other rules and regulations of state supervision authorities, technical documentation of manufacturers of OB or TS, duly approved instructions, technical and technological regulations, guiding technical materials and other technical documentation for the installation, commissioning and operation of OB and TS.

    (Modified edition. Amendment No. 1)

    1. 8... The prices take into account the costs of the production of a complex of works for one technological cycle of commissioning for the commissioning of an automated process control system in accordance with the requirements of regulatory and technical documentation, including the following stages (stages):

    1. 8.1.Preparatory work, checking the KTS (KTS) of automated systems:

    Study of working and technical documentation, incl. materials of the pre-design stage (technical requirements for the system, etc.), implementation of other activities of engineering and technical preparation of work, inspection of the technological control object, external inspection of equipment and installation work performed on the APCS, determination of the readiness of systems adjacent to the APCS (power supply, etc.) etc.), etc.

    Verification of the compliance of the main technical characteristics of the equipment with the requirements established in the passports and instructions of the manufacturers (the results of the inspection and adjustment are recorded in the certificate or passport of the equipment, the faulty PTS or TS are handed over to the customer for repair and replacement).

    (Modified edition. Amendment No. 1)

    1. 8. 2... Autonomous adjustment of automated systems after completion of their installation:

    Checking the installation of the TCP (TS) for compliance with the requirements of the manufacturer's instructions and working documentation;

    Replacement of individual defective elements with serviceable ones issued by the customer;

    Checking the correctness of marking, connection and phasing of electrical wiring;

    Phasing and control of the characteristics of actuators (MI);

    Setting up logical and temporal interconnections of alarm, protection, blocking and control systems, checking the correctness of the signal flow;

    Checking the functioning of the application and system software;

    Preliminary determination of the characteristics of the object, calculation and adjustment of the parameters of the equipment of automated systems, configuration of measuring transducers and program-logical devices;

    Preparation for switching on and putting into operation of measurement, control and management systems to ensure individual testing of technological equipment and adjustment of settings for control systems equipment in the course of their operation;

    Registration of production and technical documentation.

    (Modified edition. Amendment No. 1)

    1. 8. 3... Complex adjustment of automated systems:

    Bringing settings parametersNS TS (TS), communication channels and application software to values ​​(states) at which automated systems can be used in operation, while being carried out in a complex:

    Determination of the conformity of the order of testing devices and elements of alarm systems, protection and control to the algorithms of the working documentation with the identification of the reasons for their failure or "false" operation, setting the necessary values ​​for the operation of positioning devices;

    Determination of the correspondence of the throughput of shut-off and controluyusch her fittings to the requirements of the technological process, the correctness of working out the limit and limit switches,position and condition sensors;

    Determination of the flow characteristics of regulatory bodies (RO) and bringing them to the required norm using the adjustment elements available in the design;

    Clarification of the static and dynamic characteristics of the object, correction of the values ​​of the system settings, taking into account their mutual influence during operation;

    Preparation for putting systems into operation to ensure comprehensive testing of technological equipment;

    Testing and determining the suitability of automated systems to ensure the operation of technological equipment with a performance that meets the standards for the development of design capacities in the initial period;

    Analysis of the work of automated systems;

    Registration of production documentation, an act of acceptance into operation of systems in accordance with the requirements of SNiP;

    Making in one copy of the schematic diagrams from the set of working documentation changes agreed with the customer, based on the results of the start-up production d full-time work.

    1.9... The prices of this Collection do not include the costs of:

    Puscon L and daughters e works, prices for which are given in the relevant sections EPp-2001-01 "Electrical devices": for electrical machines (motors) of electric drives, switching devices, static converters, power devices, measurements and tests in electrical installations;

    Testing of automated systems over24hours of their work during the period of complex testing of technological equipment;

    Drawing up a technical report and estimate documentation;

    Delivery of measuring instruments to the state verification;

    Configuring components and screen forms, adjusting and finalizing the design mathematical, information and software, determined on the basis of standards for design work;

    Revision of PTS (TS), elimination of their defects (repair) and installation defects, including bringing the insulation of electrical equipment, cable communication lines and parameters of mounted fiber-optic and other communication lines up to standards;

    Checking the compliance of wiring diagrams with schematic diagrams and making changes to wiring diagrams;

    Drawing up basic, installation, detailed diagrams and drawings;

    Partial or complete reassembly of cabinets, panels, consoles;

    Coordination of the work performed with the supervisory authorities;

    Carrying out physical, technical and chemical analyzes, supply of exemplary mixtures, etc .;

    Drawing up a program for complex testing of technological equipment;

    Operational personnel training;

    Development of operational documentation;

    Maintenance (service) maintenance and periodic checks of the KTS (KTS) during the operation.

    (Modified edition. Amendment No. 1)

    1.10... The prices of this Collection are developed for automated systems (hereinafter - systems), depending on the category of their technical complexity, characterized by the structure and composition of the CTS (CTS),taking into account the complexity factor.

    table 1

    System characteristics (structure and composition of KTS or KTS)

    System complexity factor

    Single-level information, control, information and control systems, characterized in that measuring and control systems are used as components of the CTS to perform the functions of collecting, processing, displaying and storing information and generating control commands. at devices, electromagnetic, semiconductor and other components, signal fittings, etc. instrument or hardware types of execution

    Single-level information, control, information and control systems, characterized in that programmable logic controllers ( PLC ), intrasystem communication devices, microprocessor operator interfaces (display panels)

    1, 313

    Single-level systems with an automatic mode of indirect or direct (direct) digital (digital-to-analog) control using object-oriented controllers with programming of settings parameters, for the functioning of which the development of project hardware and software is not required

    Information, control, information and control systems, in which the composition and structure of the CTS meet the requirements established for classifying systems as I categories of complexity and in which fiber-optic are used as communication channels To no information transmission systems (VOSPI)

    Systems for measuring and (or) automatic regulation of the chemical composition and physical properties of a substance

    Measuring systems (measuring channels) for which metrological certification (calibration) is required according to the project

    Multilevel distributed information, control, information and control systems, in which the composition and structure of the local level CPTS meet the requirements established for classifying the system as II -th category of complexity and in which processes are used to organize subsequent levels of management s (PCS ) or operator ( OS ) stations; implemented on the basis of problem-oriented software, interconnected with each other and with the local control level by means of local computer networks

    1, 566

    Information, control, information and control systems in which the composition and structure of the KTS (KTS) meets the requirements established for classifying systems as II categories of complexity and in which fiber-optic information transmission systems (FOTS) are used as communication channels

    Notes: 1 ... Systems II and III categories of technical complexity can have one or more signs,given as a characteristic of the system.

    2... In the event that a complex system contains systems (subsystems), according to the structure and composition of the KTS or KTS are attributed to different categories of technical complexity, the complexity factor of such a system is calculated in accordance with cl. .

    1.11.Pricing is developed for systems I, II and III categories of technical complexity, depending on the number of communication channels for the formation of input and output signals.

    A communication channel for the formation of input and output signals (hereinafter referred to as a channel) should be understood as a set of technical means and communication lines that ensure the transformation, processing and transmission of information for use in the system.

    The Collection takes into account the number of:

    Information channels (including measurement, control, notificationNS x, address, state, etc.);

    Control channels.

    As part of information channels and control channels, in turn, the number of channels is taken into account:

    Discrete - contact and non-contact on alternating and direct current, pulse from discrete (signaling) measuring transducers, for monitoring the status of various two-positionNS x devices, as well as for the transmission of signals such as "on-off", etc .;

    Analog, which include (for the purposes of this Collection) all the others - current, voltage, frequency, mutual inductance, natural or unified signals of measuring transducers (sensors) that change continuously, coded (pulse or digital) signals for the exchange of information between various digital information processing devices, etc.

    In the further presentation, the symbols for the number of channels are used, given in table. .

    table 2

    Symbol

    Name

    K a and

    Number of information analog channels

    K d and

    Number of information discrete channels

    K a y

    Number of analog control channels

    K d y

    Number of discrete control channels

    To general and

    The total number of information analog and discrete channels

    To general

    The total number of analog and discrete control channels

    K total = (K total and + K total y)

    The total number of information and control channels, analog and discrete

    2... The procedure for applying unit rates

    2.1.In the tables of prices of the Collection, basic prices are given ( R b) for commissioning NS e work for systems I, II and III categories of technical complexity ( R Ib, R IIb, R IIIb), depending on the total number of information and control channels, analog and discrete(To total) in this system.

    (Modified edition. Amendment No. 1)

    2. 2. For a complex system, consisting of subsystems of different categories of technical complexity, the components of the price - the amount of funds for wages (salary) and the rate of labor (N) - is calculated as follows:

    at 1< С < 1,313 , where C is the complexity factor, calculated by the formula:

    where: - total amount analog and discrete information and control channels related to subsystems, respectively, I, II, III difficulty categories;

    (1.1)

    where is the base wage according to the table. 02-01-001 for system I categories of technical complexity (C = 1);

    The base rate of labor costs according to the table. 02-01-001.

    at 1.313< С < 1,566

    (2.1)

    where is the base wage according to the table. 02-01-002 for system II categories of technical complexity (C = 1.313).

    where is the base rate of labor costs according to the table. 02-01-002.

    (Modified edition. Rev. No. 1 )

    2. 3... When drawing up estimate calculations (estimates) for the start-up okay e works to take into account the characteristics of a specific system to the base price ( R b) the following factors should be applied:

    2. 3. 1 ... Coefficient F m andtaking into account two factors: "metrological complexity" and "development» information functions "system

    Coefficient F m andcalculated by the formula:

    F m and = 0 , 5 + K a and : To total × M × I, (3)

    where M - coefficient of "metrological complexity", determined according to table. ;

    AND - coefficient of "development of information functions", determined according to the table. .

    table 3

    Item No.

    Characteristics of factors of "metrological complexity" ( M) systems

    The coefficient of "metrological complexity" of the system ( M)

    Measuring transducers (sensors) and measuring devices, etc., operating in a normal environment and technological environment, accuracy class:

    less than or equal to 1 , 0

    K a uM1

    1

    below 0 , 2 and higher 1, 0

    K a uM2

    1, 14

    greater than or equal to 0 , 2

    K a uM3

    1, 51

    Note : If the system contains measuring transducers (sensors) and measuring instruments attributed to different accuracy classes, the coefficient M calculated by the formula:

    M = (1 + 0.14 ×K a uM2: K a and) × (1 + 0.51 ×K a uM3: K a and),(4)

    where:

    K a and = K a uM1 + K a uM2 + K a uM3 ;(4. 1)

    table 4

    Item No.

    Characteristics of factors of "development of information functions" ( AND) systems

    Number of channels designation

    The coefficient of "development of information functions" of the system ( AND)

    1

    Parallel or centralized control and measurement of the state parameters of the technological control object (TOC)

    K total uI1

    1

    The same as in p. . ,including archiving, data documentation, preparation of emergency and production (shift, daily, etc.) reports, presentation of parameter trends, indirect measurement (calculation) of individual complex indicators of the operation of the TOU

    K total uI2

    1, 51

    Analysis and generalized assessment of the state of the process as a whole according to its model (recognition of the situation, diagnostics of emergency conditions, search for a "bottleneck", forecast of the process)

    K total and I3

    2, 03

    Note : If the system has different characteristics of "development of information functions", the coefficient AND calculated by the formula:

    And = (1+ 0.51 × K total uI2: TOtotal) × ( 1+1, 03 × K total and I3: TOtotal) ,(5)

    where:

    To general and = K bosch uI1 + K total uI2 + K total uI3; (5.1 )

    (Modified edition. Amendment No. 1)

    2. 3. 2... Coefficient Ugh, taking into account the "development of management functions", calculated by the formula:

    Ugh= 1+ (1.31 × K and at+ 0.95 × K d y ) : To general × Have,(6)

    where: Have- the coefficient of "development of management functions", is determined by the table.

    table 5

    Item No.

    Characteristics of factors of "development of management functions" ( Have) systems

    Number of channels designation

    The coefficient of "development of control functions" of the system(Have)

    Single-circuit automatic control (AR) or automatic single-cycle logical control (switching, blocking, etc.).

    To general uU1

    1

    Cascade and (or) software AR or automatic software logic control (ANS LU) on a "hard" cycle, multiply connected AR or APLU on a cycle with branching.

    K total uU2

    1, 61

    Office b fast by them processes in emergency conditions or control with adaptation (self-learning and change of algorithms and system parameters) or optimal control (OC) of steady modes (in static), OC of transient processes or the process as a whole (optimization in dynamics).

    K general uU3

    2, 39

    Note : If the system has different characteristicsR development of management functions ", coefficient Have calculated by the formula:

    Y = (1+ 0.61 × K total uU2: To general) × (1+ 1, 39 × K general uU3: To general); (7)

    where:

    To general = K bosch yU1 + K total yU2 + K total yU3; (7.1)

    2. 4... Estimated price ( R) for a specific system is calculated by applying to the base rate established in accordance with clause .,coefficients F m and , Ugh, which are multiplied among themselves I:

    R = P b ×(F m and × f y).(8)

    2. 5... When starting up la daughter x works in more difficult production conditions, in comparison with those provided for in the collection, as a result of which labor productivity decreases, the coefficients given in the Guidelines for the application of federal unit rates for start-up should be applied to the prices handy work.

    2. 6... When performing repeated commissioning (before the commissioning of the facility), the coefficient must be applied to the prices 0, 537... Under the repeated commissioning work should be understood the work caused by the need to change the technological process, the operating mode of the technological equipment, due to a partial change in the project or the forced replacement of equipment. The need to re-perform the work must be confirmed by a justified assignment (letter) of the customer.

    2. 7... In the event that the APCS is created as part of an automated technological complex (ATC) included in the pilot or experimental construction plan, or in the list of unique or especially important (most important) objects (construction projects), or the APCS includes experimental or experimental software and hardware (technical) means, a coefficient is applied to prices 1, 2.

    2. 8... In the event that the launcher okay e works are carried out under the technical guidance of the personnel of the manufacturer or the supplier of the equipment, the coefficient should be applied to the prices 0, 8.

    2... 9. Specified in paragraphs. ÷ the coefficients are applied to the cost of those stages of work (the corresponding number of information and control channels), which are subject to the above conditions. When using multiple factors, they should be multiplied.

    2. 10. Reducing coefficient for the same type of automated technological complexes (ATK) in accordance with clause 2.5. MDS 81-40.2006 is taken into account by the norms of this Book, subject to a special calculation procedure, in which the price is determined initially as a whole for several ATK of the same type in accordance with the project and, if necessary, a rate is allocated for one ATK of the same type.

    It is not allowed, when determining the estimated prices, artificial, contrary to the project, the division of the automated system into separate measurement systems, control (regulation) loops, subsystems.

    For example: For a centralized system of operational dispatch control of ventilation and air conditioning, which includes several subsystems of supply and exhaust ventilation, the estimated price is determined as a whole for the centralized control system, and the costs for individual subsystems, if necessary, are determined within the framework of the general price for the whole system , taking into account the number of channels referred to subsystems.

    (Modified edition. Amendment No. 1)

    2. 11... If intermediate calculations for the completed commissioning work are necessary, it is recommended to use the approximate structure of the cost of commissioning works by their main stages (if the contract does not provide for other conditions for mutual settlements of the parties), given in Table. .

    table 6

    Item No.

    The name of the stages of the commissioning

    Share in the total cost of work,%

    Preparatory work, inspection of TCP (PS):

    25

    incl. preparatory work

    10

    Autonomous system setup

    55

    Complex commissioning of systems

    20

    Total

    100

    Notes:

    2... In the event that the customer engages one organization to carry out commissioning work on software and hardware (for example, a project developer or an equipment manufacturer who has the appropriate licenses to perform start-up okay x works), and by technical means - another start-up daughter u organization, distribution of the volume of work performed by them (within the framework of the total cost of work on the system), including by stages of the table. , is produced, as agreed with the customer, taking into account O the total number of channels attributed to OB and TS.

    (Modified edition. Amendment No. 1)

    3... The procedure for preparing the initial data for the preparation of estimates

    3.1.The preparation of initial data for the preparation of estimates is carried out on the basis of design and technical documentation for a specific system.

    When preparing the initial data, it is recommended to use the "Scheme of an automated technological complex (ATC)» given in the appendix .

    The preparation of the initial data is carried out in the following sequence:

    3.1.1.As part of the ATK, according to the scheme, the following groups of channels are distinguished according to table. .

    table 7

    Item No.

    Channel group symbol

    Channel group content

    1

    CBTWITHTOU(KTS)

    Analog and discrete control channels (K but at and K d y )transfer of control actions from K NS TS (KTS) at TOU ... The number of control channels is determined in count actuators: diaphragm, piston, electrical single and multi-turn, motorless (cut-off), etc.

    2

    TOUKTS (KTS)

    but and and K d and )converting information (parameters) coming from the technological control object (TOC) to KTS (KTS) ... The number of channels is determined quantity measuring transducers, contact and non-contact signaling devices, position and equipment status sensors, limit and limit switches, etc. wherein combined fire detectorn signaling ( Pic) is taken into account as one discrete channel

    3

    Op→ K PTS (KTS)

    Analog and discrete information channels (K but and and K d and )used by the operator (Op) to influence the KTS (KTS) .

    The number of channels is determined number of organs of influence used by the operator ( buttons, keys, control dials etc.) to implement the functioning of the system in the modes of automated (automatic) and manual remote control of actuators excluding organs as channels impact KTS (KTS) used for tuning and other auxiliary functions (except for control): keyboard of terminal devices of information and control panels, buttons, switches, etc., panels of multifunctional or multichannel devices of control panels of POS, etc., as well as voltage switches, fuses and other auxiliary devices for the action of the above and other technical meansthe adjustment of which is taken into account by the prices and norms of this Collection

    4

    KPTS→ About n (KTS)

    Analog and discrete channels (TO and and and K e i) displaying information coming from KTS (KTS) to Op when determining the number of channels of the system not taken into account, except for cases when the project provides for the display of the same technological parameters (equipment status) on more than one terminal device (monitor, printer, interface panel, information board, etc.). The adjustment of information displays on the first terminal device is taken into account by the prices of this Collection.

    In this case, when displaying information on each terminal device in excess of the first, the displayed parameters ( TO but and and K d and ) are taken into account TO but and with a factor0, 025, K d and with a factor0, 01 .

    Not taken into account indicators (lamps, LEDNS etc.) states and positions built into measuring transducers (sensors), contact or non-contact signaling devices, buttons, control keys, switches, as well as indicators of the presence of voltage of devices, recorders, terminal devices of boards, consoles, etc., adjustment of which is taken into account in the prices of this Collection

    5

    SMS

    1, № 2, … , № i

    Communication channels (interaction) analog and discrete information (K a and and K d and) with adjacent systems, made according to separate projects. “The number of physical channels through which communication signals (interaction) with adjacent systems are transmitted is taken into account:

    discrete - contact and non-contact direct and alternating current (except for coded ones) and analog signals, the values ​​of which are determined on a continuous scale, as well as, for the purposes of this Collection, coded (pulse and digital) ”. Different types of voltage electrical systems used as power supplies for APCS equipment (boards, consoles, actuators, information converters, terminal devices, etc.) as communication channels (interaction) with adjacent systems not taken into account.

    (Modified edition. Amendment No. 1)

    3. 1. 2... For each channel group tab. the number of information channels (analog and discrete) and control channels (analog and discrete), as well as e the total number of information and control channels ( TO total) in the whole system.

    3.1. 3... Based on the table. the category of technical complexity of the system is established and, depending on TO totalthe base price is determined according to the corresponding table of prices (R b), if necessary, a base rate is calculated for a complex system(R sl b)- using formulas ( ) and ( ).

    3. 1. 4... To link the base price to a specific system, correction factors are calculated F and mand F atin accordance with paragraphs. and , then the estimated price is calculated using the formula ( ).

    SECTION 01. AUTOMATED CONTROL SYSTEMS

    Price code

    Name and technical characteristics of equipment

    Direct costs (remuneration of commissioning personnel), rubles

    Labor costs, man-h

    Table 02-01-001 Automated control systems of the 1st category of technical complexity

    Meter : system (rates 1 , 3 , 5 , 7 , 9 , 11 , 13 , 15 , 19 ); channel (rates 2 , 4 , 6 , 8 , 10 , 12 , 14 , 16 , 18 , 20 )

    02- 01- 001- 02

    TO total ):

    190, 07

    13, 4

    02- 01- 001- 02

    for each channel of St. 2before 9add to rate 1

    6, 45

    02- 01- 001- 03

    10

    921, 99

    65

    02- 01- 001- 04

    for each channel of St. 10before 19add to rate 3

    6, 3

    02- 01- 001- 05

    20

    128

    02- 01- 001- 06

    for each channel of St. 20before 39add to rate 5

    87, 23

    6, 15

    02- 01- 001- 07

    40

    3560, 31

    251

    02- 01- 001- 08

    for each channel of St. 40before 79add to rate 7

    6, 03

    02- 01- 001- 09

    80

    6978, 77

    492

    02- 01- 001- 10

    for each channel of St. 80before 159add to rate 9

    83, 40

    5, 88

    02- 01- 001- 11

    160

    13645, 49

    962

    02- 01- 001- 12

    for each channel of St. 160before 319add to rate 11

    78, 72

    5, 55

    02- 01- 001- 13

    320

    26241, 32

    02- 01- 001- 14

    for each channel of St. 320before 639add to rate 13

    73, 62

    5, 19

    02- 01- 001- 15

    640

    49787, 59

    02- 01- 001- 16

    for each channel of St. 640before 1279add to rate 15

    62, 55

    4, 41

    02- 01- 001- 17

    89787, 88

    02- 01- 001- 18

    for each channel of St. 1280before 2559add to rate 17

    49, 50

    3, 49

    02- 01- 001- 19 2 , 4 , 6 , 8 , 10 , 12 , 14 , 16 , 18 , 20 )

    02- 01- 002- 01

    System with the number of channels (TO total ):

    260, 59

    17, 6

    02- 01- 002- 02

    for each channel of St. 2before 9add to rate 1

    125, 41

    8, 47

    02- 01- 002- 03

    10

    1258, 51

    85

    02- 01- 002- 04

    for each channel of St. 10before 19add to rate 3

    122, 89

    8, 3

    02- 01- 002- 05

    20

    2487, 41

    168

    02- 01- 002- 06

    for each channel of St. 20before 39add to rate 5

    119, 93

    8, 1

    02- 01- 002- 07

    40

    4885, 98

    330

    02- 01- 002- 08

    for each channel of St. 40before 79add to rate 7

    117, 12

    7, 91

    02- 01- 002- 09

    80

    9564, 68

    646

    02- 01- 002- 10

    for each channel of St. 80before 159add to rate 9

    7, 71

    02- 01- 002- 11

    160

    18699, 98

    02- 01- 002- 12

    for each channel of St. 160before 319add to rate 11

    107, 94

    7, 29

    02- 01- 002- 13

    320

    35978, 58

    02- 01- 002- 14

    for each channel of St. 320before 639add to rate 13

    100, 83

    6, 81

    02- 01- 002- 15

    640

    68255, 66

    02- 01- 002- 16

    for each channel of St. 640before 1279add to rate 15

    5, 78

    02- 01- 002- 17

    123037, 86

    02- 01- 002- 18

    for each channel of St. 1280

    Meter : system (rates 1 , 3 , 5 , 7 , 9 , 11 , 13 , 15 , 19 ); channel (rates 2 , 4 , 6 , 8 , 10 , 12 , 14 , 16 , 18 , 20 )

    02- 01- 003- 01

    System with the number of channels (TO total ):

    2

    341, 85

    21

    02- 01- 003- 02

    for each channel of St.2before 9add to rate 1

    164,41

    10, 1

    02- 01- 003- 03

    10

    1660, 41

    102

    02- 01- 003- 04

    for each channel of St.10before 19add to rate 3

    159, 53

    9, 8

    02- 01- 003- 05

    20

    3255, 70

    200

    02- 01- 003- 06

    for each channel of St.20before 39add to rate 5

    156, 76

    9, 63

    02- 01- 003- 07

    40

    6397, 45

    393

    02- 01- 003- 08

    for each channel of St.40before 79add to rate 7

    153, 67

    9, 44

    02- 01- 003- 09

    80

    12534, 44

    770

    02- 01- 003- 10

    for each channel of St.80before 159add to rate 9

    149, 76

    9, 2

    02- 01- 003- 11

    160

    24515, 42

    1506

    02- 01- 003- 12

    for each channel of St.160before 319add to rate 11

    141, 62

    8, 7

    02- 01- 003- 13

    320

    47175, 09

    2898

    02- 01- 003- 14

    for each channel of St.320before 639add to rate 13

    132, 18

    8, 12

    02- 01- 003- 15

    640

    89482, 91

    5497

    02- 01- 003- 16

    for each channel of St.640before 1279add to rate 15

    112, 32

    6, 9

    02- 01- 003- 17

    1280

    161368, 77

    9913

    02- 01- 003- 18

    for each channel of St.1280before 2559add to rate 17

    89, 04

    5, 47

    02- 01- 003- 19

    2560

    275350, 81

    16915

    02- 01- 003- 20

    for each channel of St.2560add to rate 19

    72, 11